Standby Generator Cost Calculator

Last updated: October 15, 2026

Estimate standby generator installation cost including equipment, labor, transfer switch, fuel connection, site work, permits and maintenance.

Starting figures illustrate this model. Enter your own measurements, quoted costs and applicable terms; this page does not retrieve live prices or provider rates.

Estimated net standby generator cost

—

  • Gross project cost: —
  • Electrical and fuel connection: —
  • First-year maintenance: —
  • Contingency and rebates: —
On this page

Quick summary: Estimate standby generator installation cost including equipment, labor, transfer switch, fuel connection, site work, permits and maintenance.

Updated October 14, 2026 • Estimated reading time: 4 minutes
Read the complete guide

What this calculator estimates

Estimate standby generator installation cost including equipment, labor, transfer switch, fuel connection, site work, permits and maintenance.

How to use it

Enter Generator equipment cost ($); Installation labor ($); Transfer switch and electrical work ($); Gas or propane connection ($); Pad, permits and inspections ($); First-year maintenance and testing ($); Rebates or credits ($); Contingency (%). Select Calculate to update the results.

How the calculation works

Equipment, labor, transfer switch, fuel connection, site work and maintenance are added. Contingency is applied and rebates are subtracted.

Worked example: starting scenario

Example inputs
Generator equipment cost ($)9500
Installation labor ($)4200
Transfer switch and electrical work ($)2600
Gas or propane connection ($)1800
Pad, permits and inspections ($)1200
First-year maintenance and testing ($)450
Rebates or credits ($)0
Contingency (%)8
Example results
Estimated net standby generator cost$21,330.00
Gross project cost$21,330.00
Electrical and fuel connection$4,400.00
First-year maintenance$450.00
Contingency and rebates$1,580.00

Important limitations

Generator size, load management, utility coordination, fuel availability, trenching, code, noise rules and electrical service affect actual proposals.